Easy DIY Installation
Cargo Lifts are easy to install for a Do It Yourself Project. After you determine WHERE you want to install your lift, take a look at the information on this page to see some basic requirements that you should consider.
How to Determine Gate Positions in Relation to the Aluminum Supports

OPTIONAL:
Multiple Gate Openings are available in ANY LOCATION except where the back support poles are located. You can also have Gate Combinations of location #1 and #2 OR #2 and #3 OR all 3 Sides with Gates or NO GATES.
Electrical Requirements and Slab Size Information
Electrical Requirements
220/20 amp electrical is required to safely operate your lift.
Typically a "Junction Box" is used to feed/connect our Cargo Lift Control Panel. A Disconnect Box can be installed UNDER the deck by your electrician.

Interested in Powder Coating Your Cargo Lift?
Powder Coating applies to the basket and mounting brace. The support poles are NOT painted. The aluminum canopy option is also painted. * Please allow 2 weeks additional time when placing your order.